Dwelling general load (120.41 / Table 120.45)
2026 NEC 120.41 uses 2 VA/sq ft for feeders/services while 120.13 keeps 3 VA/sq ft for branch-circuit counts.
- Unit lighting load2 VA / sq ft
- Gross combined VA10,100 VA
- Net demand load5,485 VA
- Min 15A lighting circuits (3 VA/sq ft)5 circuits
Single electric range (Table 120.55)
Col. B (<=8.75 kW = 80%), Col. C (8.75 to 12 kW = 8 kW), and Note 1 (+5% per kW or major fraction over 12 kW).
- Major fraction over 12 kW4 kW
- Note 1 increase+20%
- Maximum demand load9.6 kW (9,600 VA)
Box fill with 5+ grounds (314.16(B)(5))
First 4 EGCs count as 1.0 allowance; each additional EGC beyond 4 adds 0.25 allowance (2023 and 2026 NEC).
- EGC allowance (with clamps = 1)1.25 allowances
- Total volume allowances10.25
- Minimum required box volume23.0625 cu. in.
Three-phase motor sizing (Table 430.250)
430.6(A)(1) mandates Table 430.250 FLC for conductors (125%) and inverse-time breakers (250%).
- Table 430.250 FLC34 A
- Min conductor ampacity (430.22)42.5 A
- Max inverse-time breaker (430.52)90 A
Dwelling optional load (120.82(B) 8 kVA tier)
2026 NEC 120.82(B) takes the first 8,000 VA at 100% plus 40% of the remainder.
- 100% first-tier cap8,000 VA
- Remainder @ 40%18,500 VA
- Net optional general load26,500 VA
EMT conduit fill (Ch. 9 Table 1 31% 2-wire rule)
1 conductor = 53% max fill; 2 conductors = 31% max fill; 3 or more conductors = 40% max fill.
- Governing Ch. 9 Table 1 fill limit31%
- Total THHN conductor area0.4446 sq. in.
- Minimum permitted EMT trade size1-1/4" EMT